Transportation Improvement Program
Programs
Program Overview
Draft 2027-2030 Transportation Improvement Program now Available for Review
RTC is encouraging public comment on the draft 2027-2030 Transportation Improvement Program (TIP) that includes the programming of over $5 billion in major transportation projects within the Clark County region. Transportation investment will include many state highway, city, and county streets; transit facilities; and bicycle and pedestrian projects.
The formal public comment and review period will run from September 4, 2026, through October 6, 2026. The RTC Board is scheduled to approve the final 2027-2030 Transportation Improvement Program at its Tuesday October 6, 2026 meeting.
Comments on the draft document can be made using the public feedback form on RTC's website or by contacting the TIP Program Manager at .
Transportation Improvement Program (TIP)
The TIP is a four-year program of regionally significant transportation projects. Projects programmed in the TIP are drawn either directly from specific project recommendations made in the Regional Transportation Plan (RTP) or are developed from a more general series of recommendations (e.g. preservation, maintenance, safety, etc.). The TIP represents an agency’s intent to implement a specific project and the anticipated flow of funds for that project. Regionally selected transportation projects are incorporated into the TIP along with other regionally significant projects selected for funding at the state or federal level.
The TIP is developed by RTC through a cooperative and coordinated process involving local jurisdictions, WSDOT, and C-TRAN. RTC is required by federal law to maintain a four-year TIP, that is updated at least every two years. As the MPO for the region, RTC selects and prioritizes projects programmed in the TIP.
Current Transportation Improvement Program
RTC Board adopted the 2026-2029 TIP on October 7, 2025
Draft 2027-2029 TIP is currently out for public comment
FHWA/FTA review currently underway
The TIP prior to any amendment is available for download in PDF format (see sidebar). However, the projects included in the TIP are occasionally changed, and the searchable web database listed under Current Projects should be checked for current projects. For list of amendments to the current TIP please check under TIP Amendments.
The TIP becomes part of the Statewide Transportation Improvement Program (STIP) which is Washington States four-year, fiscally constrained prioritized multimodal transportation program of state, local, tribal, and public transportation projects. The STIP is a calendar year document and is developed on an annual basis with monthly updates from January through October.
Downloads
DRAFT MPO TIP, 2027-2030 (PDF, 3MB)
MPO TIP, 2026-2029 (PDF, 3MB)
RTPO TIP, 2026-2029 (PDF, 2MB)
MPO TIP, 2025-2028 (PDF, 3MB)
RTPO TIP, 2025-2028 (PDF, 1,022KB)
Programming Guidebook (PDF, 7MB)
Regional Complete Streets Policy (PDF, 819KB)
Clark County Regional Transportation Atlas(PDF, 5MB)
Regional Network Design Review Form (PDF, 128KB)
Before & After Analysis (DOCX, 91KB)
Showcase Template (DOCX, 27KB)

