| Agency | Status | Project |
| Battle Ground | Design | Chelatchie Prairie Rail with Trail |
| Battle Ground | Design | SW Eaton Boulevard Improvements |
| Battle Ground | Design | SE Grace Avenue, Main to Rasmussen |
| Battle Ground | Design | SR 503/NW Onsdorff Intersection |
| Battle Ground | Under Construction | Small Cities ATMS |
| Battle Ground | Completed (2023) | SR-502/SR-503 Intersection Improvements |
| Bingen | Design | Sidewalks Alder and Cedar |
| Camas | Design | SR 500/Everett Street |
| Camas | Under Construction | NW 38th Avenue |
| Camas | Completed (2020) | NW Brady Road Improvements |
| Camas | Completed (2016) | NW 38th Avenue/SE 20th Street, Phase 2 |
| Camas | Completed (2015) | NW 18th Avenue Bike and Pedestrian Trail |
| Camas | Completed (2013) | NW 38th Avenue/SE 20th St., Armstrong to 192nd Av. |
| Clark County | Design | System-Wide Signal Enhancement |
| Clark County | Design | I-5/NE 179th Street |
| Clark County | Design | NE 152nd Avenue, NE Padden Parkway-NE 99th Street |
| Clark County | Design | NE 179th Street at 29th |
| Clark County | Design | NE 182nd Avenue/NE Risto Road |
| Clark County | Design | Orchards Sifton Adaptive Signals |
| Clark County | Design | NE 179th Street (NE 15th Avenue - NE 26th Avenue) |
| Clark County | Design | Highway 99 Sidewalk (NE 110th -117th St.) |
| Clark County | Right of Way | NE 15th Avenue |
| Clark County | Under Construction | Signal Timing, Evaluation, Verification, Enhancement - Phase 2 |
| Clark County | Under Construction | NE 68th Street Sidewalk |
| Clark County | Under Construction | Highway 99 Sidewalk (NE 102nd St - NE 104th St) |
| Clark County | Under Construction | NE 119th Street/NE 152nd Avenue |
| Clark County | Under Construction | NE Delfel Road |
| Clark County | Completed (2016) | Carty Road Reconstruction |
| Clark County | Completed (2018) | NE 119th Street (NE 50th Avenue to NE 72nd Avenue) |
| Clark County | Completed (2019) | Signal Timing, Evaluation, Verification and Enhancement |
| Clark County | Completed (2015) | NE 47th Avenue/NE 78th Street Intersection |
| Clark County | Completed (2016) | NE 119th Street (NE 72nd to NE 87th Av) |
| Clark County | Completed (2016) | NE 94th Avenue (NE Padden Parkway to NE 99th Street) |
| Clark County | Completed (2015) | Highway 99 Traffic Responsive Incident Management |
| Clark County | Completed (2018) | Orchards Traffic Signal Optimization |
| Clark County | Completed (2015) | Hazel Dell Area Sidewalk |
| Clark County | Completed (2015) | Salmon Creek Avenue Path |
| Clark County | Completed (2015) | 78th Street Signal Optimization Project |
| Clark County | Completed (2015) | Barberton Traffic Signal Optimization |
| Clark County | Completed (2015) | Hazel Dell-Felida Traffic Signal Optimization |
| Clark County | Completed (2017) | Highway 99 Pedestrian/Bicycle Improvements |
| Clark County | Completed (2014) | Highway 99 Traffic Signal Optimization |
| Clark County | Completed (2021) | Highway 99 Corridor Improvements |
| Clark County | Completed (2013) | Miovision Data Collection |
| Clark County | Completed (2013) | NE 10th Avenue (NE 141 to 149th Street) |
| Clark County | Completed (2019) | NE 10th Avenue (NE 154 to NE 164th Street) |
| Clark County | Completed (2019) | NE 119th Street East |
| Clark County | Completed (2013) | NE 119th Street/NE 50th Avenue Intersection |
| Clark County | Completed (2014) | NE 88th Street (West) |
| Clark County | Completed (2019) | NE Blair Road |
| Clark County | Completed (2014) | Timmen Road |
| Clark County | Completed (2019) | Working to Refine InteliGent Highway Transportation (WRIGHT) |
| Clark County | Completed (2013) | 2010 School Sidewalk Project |
| Clark County | Completed (2013) | 2010 Sidewalk Enhancement Project |
| Clark County | Completed (2016) | Transportation System Management and Operations, Phase 2 |
| Clark County | Completed (2023) | NE 99th Street |
| Clark County | Completed (2023) | NE 134th Corridor Adaptive Traffic Signals |
| Clark County | Completed (2023) | NE Hazel Dell Avenue Sidewalk |
| Clark County | Completed (2022) | NE 10th Avenue, NE 149th St. -NE 154th St |
| Clark County | Completed (2020) | Ridgefield Main Avenue Access Improvements |
| Clark County Historical Society | Completed (2013) | Exhibit at Vancouver Depot |
| C-TRAN | Programmed | Fourth Plain Bus Rapid Transit Extension |
| C-TRAN | Design | Highway 99 Bus Rapid Transit |
| C-TRAN | Under Construction | (7) 40' Hydrogen Fuel Cell Buses |
| C-TRAN | Completed (2019) | Hybrid Buses 2014 |
| C-TRAN | Completed (2017) | Fourth Plain Bus Rapid Transit |
| C-TRAN | Completed (2021) | Transit Signal Priority-Highway 99 |
| C-TRAN | Completed (2017) | Fisher's Landing Transit Center Expansion |
| C-TRAN | Completed (2017) | Hybrid Buses 2012 |
| C-TRAN | Completed (2023) | Electric Buses 2016 |
| C-TRAN | Completed (2023) | Mill Plain TSP Phase II |
| C-TRAN | Completed (2016) | Hybrid Buses 2010 |
| C-TRAN | Completed (2023) | Electric Buses 2017 |
| C-TRAN | Completed (2023) | Mill Plain Bus Rapid Transit (BRT) |
| Klickitat County | Completed (2012) | Centerville Hwy-Lyle Path, Phase 2 |
| Klickitat County | Completed (2015) | 6th Street Sidewalk |
| La Center | Design | 4th Street Widening |
| La Center | Design | Pacific Highway Shared Use Path |
| La Center | Completed (2018) | 4th St and Pacific Highway Roundabout |
| La Center | Completed (2014) | Aspen Avenue at 18th Street Crosswalk |
| La Center | Completed (2016) | LED Signs at Stonecreek and E. 4th Street |
| Port of Ridgefield | Completed (2021) | Pioneer Street Railroad Overpass |
| Port of Vancouver | Design | Renaissance Trail Segment 4 |
| Port of Vancouver | Design | Renaissance Trail Segment 5 |
| Port of Vancouver | Completed (2015) | Transit Terminus to Port Center Project |
| Port of Vancouver | Completed (2019) | Port Connector Bike/Ped Path |
| Port of Vancouver | Completed (2022) | Columbia River Renaissance Trail Connection |
| Regional Transportation Council | Design | 2020 Regional Household Travel Behavior Survey |
| Regional Transportation Council | Design | Transportation Data Study |
| Regional Transportation Council | Design | Regional Signal Timing Plans |
| Regional Transportation Council | Design | Clark County Freight Mobility Study Update |
| Regional Transportation Council | Completed (2015) | Communications Master Plan |
| Regional Transportation Council | Completed (2020) | Urban Freeway Corridors Operations Study |
| Regional Transportation Council | Completed (2017) | Bus on Shoulder Feasibility Study |
| Regional Transportation Council | Completed (2021) | Active Transportation Plan |
| Regional Transportation Council | Completed (2021) | Columbia Connects Bi-State Study |
| Regional Transportation Council | Completed (2022) | Regional ITS Architecture Study |
| Regional Transportation Council | Completed (2022) | Safety Plans |
| Regional Transportation Council | Ongoing Program | UPWP & CMP Support |
| Regional Transportation Council | Ongoing Program | VAST/TSMO Coordination and Management |
| Regional Transportation Council | Ongoing Program | RTC Program Support |
| Ridgefield | Programmed | Carty Road Multi-Purpose Trail Phase 1 |
| Ridgefield | Design | S. 10th/11th Street I-5 Overpass |
| Ridgefield | Under Construction | S 11th Street and S Timm Road Intersection Safety Improvements |
| Ridgefield | Completed (2014) | SR-501 Ridgefield Welcome Center |
| Ridgefield | Completed (2021) | Gee Creek Trail-Abrams Park to Heron Drive |
| Ridgefield | Ongoing Program | Ridgefield/I-5 South Connector Project Stage 2 |
| Port of Skamania | Completed (2020) | Stevenson Waterfront Trail |
| Skamania County | Completed (2013) | Bike/Ped Connection To Transit |
| Stevenson | Under Construction | 1st Street Pedestrian Amenities & Overlook |
| Stevenson | Completed (2015) | Trail of the Gods |
| Vancouver | Programmed | Garrison Road Sidewalk Infill |
| Vancouver | Design | NW Neighborhood Connectivity Improvements |
| Vancouver | Design | Hazel Dell and Burnt Bridge Creek Trail Crossing |
| Vancouver | Design | 192nd Avenue Corridor Improvements |
| Vancouver | Design | NE 28th Street - 138th Ave to 162nd Ave |
| Vancouver | Right of Way | NE 18th Street - NE 97th Av. to NE 107th Av. |
| Vancouver | Under Construction | NE 137th Avenue Corridor Completion |
| Vancouver | Under Construction | Evergreen Trail |
| Vancouver | Under Construction | Jefferson Realignment Project |
| Vancouver | Under Construction | SE 34th Street Safety & Mobility Project |
| Vancouver | Completed (2015) | Destination Downtown |
| Vancouver | Completed (2018) | 18th Street Improvements - Segment 1B |
| Vancouver | Completed (2017) | 162nd Avenue Fiber and Communications Project |
| Vancouver | Completed (2017) | Clark County Transportation Demand Management Program |
| Vancouver | Completed (2014) | Downtown Vancouver TMA |
| Vancouver | Completed (2019) | BRT Corridor Fort Vancouver Way/Mcloughlin Sidewalk Infill and Pedestrian Signal Upgrade |
| Vancouver | Completed (2018) | Fourth Plain Subarea Sidewalk Infill Project |
| Vancouver | Completed (2018) | Main St. - Columbia St. Traffic Signal Integration |
| Vancouver | Completed (2021) | Mill Plain Blvd. - 104th to NE Chkalov Dr. |
| Vancouver | Completed (2021) | Mill Plain Boulevard Arrival on Green Improvement Project |
| Vancouver | Completed (2013) | NE 137th Avenue, 28th St. to 49th St. |
| Vancouver | Completed (2023) | SE 1st Street, 162nd Av. to 177th Av. |
| Vancouver | Completed (2013) | Vancouver Bicycle Mobility Program II |
| Vancouver | Completed (2015) | Evergreen Highway Trail |
| Vancouver | Completed (2019) | Vancouver Waterfront Trail |
| Washougal | Design | S 27th Street Shared Use Path |
| Washougal | Design | 32nd Street Widening - Middle |
| Washougal | Completed (2021) | 32nd Street Active Traveler Information Feasibility |
| Washougal | Completed (2018) | Evergreen Way/32nd Street Improvements |
| White Salmon | Design | Bluff Pedestrian Connector Trail |
| WSDOT-SW | Programmed | SR 500, I-5 at 39th St – Corridor Connection |
| WSDOT-SW | Programmed | I-5/SR 502 to Cowlitz Way - Ramp Meters |
| WSDOT-SW | Design | SW WA Joint Operations Center |
| WSDOT-SW | Design | I-205/NB and SB Glenn Jackson Bridge to Fourth Plain Blvd. |
| WSDOT-SW | Design | I-205 Widening-SR 500 to Padden Parkway-Study |
| WSDOT-SW | Under Construction | I-205 SB 134th Street to Mill Plain Blvd Ramp Meter |
| WSDOT-SW | Under Construction | SW Washington Regional Signal System |
| WSDOT-SW | Under Construction | I-5/NB Fourth Plain On Ramp-Ramp Meter |
| WSDOT-SW | Completed (2017) | Vancouver Urban ITS Device Infill |
| WSDOT-SW | Completed (2018) | SR-503, Fourth Plain to Main Street ITS device Infill |
| WSDOT-SW | Completed (2018) | SR-503 ATIS Infill-I/S Bypass; 4th Plain to Main St. and Signal Study |
| WSDOT-SW | Completed (2015) | Bi-State Travel Time Project |
| WSDOT-SW | Completed (2021) | Centralized Signal System Enhancements |
| WSDOT-SW | Completed (2018) | Centralized Signal System-Joint ATMS throughout Clark County |
| WSDOT-SW | Completed (2019) | SR-14 ATIS Infill: I-5 to Evergreen |
| WSDOT-SW | Completed (2016) | SR-14 Traveler Information, 164th Av. to NW 6th Av. |
| WSDOT-SW | Completed (2016) | SR-503 Traveler Information - Incident Management and Communications |
| WSDOT-SW | Completed (2022) | I-205/NB Mill Plain On-Ramp-Ramp Meter |
| WSDOT-SW | Completed (2022) | Shared Central Signal Study |