Interface: WSDOT SWR Maintenance and Construction Vehicles - WSDOT SWR CV RSE
Information Flow Definitions
asset ID (Future)
A unique identification number and optional additional information. This flow represents the output of an RFID tag that is used for identification and tracking of assets, including both passive and active RFID tag technology options. For active tags, additional stored information that conveys additional information about the asset (e.g., lot number, production date, service data) may be provided along with the unique ID.
barrier system control (Future)
Information used to configure and control barrier systems that are represented by gates, barriers and other automated or remotely controlled systems used to manage entry to roadways.
barrier system status (Future)
Current operating status of barrier systems. Barrier systems represent gates, barriers and other automated or remotely controlled systems used to manage entry to roadways. Status of the systems includes operating condition and current operational state.
work zone warning notification (Future)
Notification of a work zone emergency or safety issue. This flow identifies that a work zone emergency or safety issue has occurred so that warnings may be generated by more than one system in the work zone.