Southwest Washington Regional Transportation Council

Project Showcase

Highway 99 Sidewalk (NE 102nd St - NE 104th St)

Agency: Clark County
Status: Design
FHWA Aid#: 9906(061)
Project Type: Pedestrian & Bicycle Facilities
Description: Construct curb, sidewalk, and curb ramps along the east side of Highway 99 and along south side of 104th Street to complete gaps in missing sidewalks. The project includes structural stabilization near the Tenny Creek ravine and a pedestrian safety barrier.
Termini: NE 102nd Street - NE 104th Street
Project Length: 0.12 miles
  Federal Funds Project Cost Schedule Obligation
Preliminary Engineering $145,000 $174,000 July 1, 2022 March 28, 2022
Right of Way $75,000 January 1, 2023
Construction $400,000 $678,000 July 1, 2024
Total $545,000 $927,000    

Project Photos

  • NE 104th WB end of existing sidewalk
  • #19 C-Tran Bus Stop HWY 99 & NE 104th St
  • NB end of existing sidewalk near 102nd St